Plumbers #2 visited yesterday, charging the Landlord $400 to shoot a camera down the building's sewage drain.  Camera made it 37 feet before hitting a wall.  Tons of disgusting rank up until the 37th foot.
Building is 80-90 years old.  Building's main exit pipe is clay.  Pipe is probably cracked.
Two options:  (a) hydrojet it every 6 months ($2000) or (b) tear up the major street out front and replace the pipe permanently ($14,000).  Ouch.  Landlord is getting a third opinion.
We're ordering lumber and Hardibacker today.  Lumber to build a loft/bed/closet in Bedroom #1.  Hardibacker to prep floor and walls in the bathroom.  Ceramic tile can never go on plywood.
The rest of the flooring will be raised 1/2" with plywood to smooth it out.  Kitchen will be more hardibacker as we'll lay ceramic there.  So much to do, but need another $5000 to get it done.  Looks like April 22nd to May 9th will be a lot of work.  Hopefully we discover a lot of free time to do it.
I'm still excited more and more.
Tuesday, April 7, 2009
Subscribe to:
Post Comments (Atom)
 
No comments:
Post a Comment